Infodats New Zealand

Heron Construction
Car Repair in Auckland

www.heronconstruction.co.nz
Show phone number
Remember you found this company at Infodats (09) 299976?

Address

73 Boundary Road. Papakura.. 7256, Auckland, Auckland.
Show map


Are you the owner or manager of this company?



What you should know about Heron Construction

Electrician in Auckland, Construction in Auckland, Engineering in Auckland, Engineers in Auckland

Two years later the Port of Tauranga contracted Heron to dredge the sand from lower the newly constructed wharf. The stylish cutter suction dredges are Kotuku and Beaver, they have been impaired to complete port dredging, river crossings, marina construction and maintenance, river and channel desedimentation, sand winning projects throughout New Zealand and the South Pacific. The cutter suction dredges Kotuku or Beaver were equipped with considerable booster pumps to pump the dredged material up to 2500 meres to the disposal areas. Heron Construction has two dedicated survey vessels, White Pointer and Kaiwea both these vessels were purpose built by White Pointer Boats in Gisborne.
As Heron celebrates 50 years of operation, it can look back on a expansive range of triumphant projects across New Zealand, Australia and the South Pacific. Photo NCIG DREDGE 50 years 3. jag Photo NCIG DREDGE 50 years 2a. jag Heron has grown its capacity and reputation over the final 50 years and now is involved mainly in dredging operations and marine construction works. Kimahia is predominantly based in New Zealand after completing capital and maintenance dredging for New Zealand ports and wharf and outfall infrastructure projects, behind having successfully completing dredging projects in Newcastle, Australia and Rarotonga in the Cook Islands. The dredged marine sediment was loaded into hopper barges and transported to the Port of Auckland Ferguson Reclamation where it was stabilized with cement using a pug mill on Heron’s scudded construction barge Mesenge.
This Capital Dredging Project to deepen Port Taranaki’s entrance channel, turning basin and berths involved the dredging of over 700,00 m3 of silts, sands, rocks and important boulders using the BSD Machiavelli. River Works | Current Projects. Project NCIG Coal Export Terminal Stage 2F Hasty Works and Dredging Main Works Contract Location Newcastle Australia Client Newcastle Coal Infrastructure Group

Social media

We don't have any social media account of this company

Photos and videos

This business has no pictures or videos

Reviews of Heron Construction (0)

Do you own a business?
We help you grow it

Get more clients, visibility and branding.
Let us help you achieve your targets and improve your business.

Add your company